2008 Condar Tests

Test HK-J25
February 17/08

Maple, 17% moisture, 69.6 lbs
Large pieces, smaller on top, 8 pieces
Stack sloped towards kindling
Warm heater (167F firebox temp), warm fuel (40F)
Side ignition.
Cold kindling, 3.5 lbs. -- 4 lbs would have been better.

Animation HK-J
Animation, 2 minute intervals.

gas analysis
Flue gas

TESTO Excel data file

opacity
Opacity

Condar Spreadsheet Results
Condar Spreadsheet Results

Condar Spreadsheet (includes detailed fueling data)

HK
Fuel stack. Kindling on right side. Smaller pieces on top.

fuel pile
Fuel pieces, numbered 1 - 2 from left to right.

fuel pile
Fuel pieces, numbered 3 - 6 from left to right.

fuel pile
Fuel pieces, numbered 7 - 8 from left to right.

Graphical data comparison of Condar tests


This page was updated on February 17, 2008
This page was created on February 17, 2008