Return to Lopez Labs Home Page

2008 Condar Tests

Test HK-J15
January 30/08

Large and small maple, 16% moisture, 53 lbs
9 pieces, 3.3 lbs kindling
Warm heater, cold fuel, side kindling

Clean run. Piece #1 on bottom was too large, difficult to manage coals at end.

Animation HK-J
Animation, 2 minute intervals.

gas analysis
Flue gas

TESTO Excel data file


Condar Spreadsheet Results
Condar Spreadsheet Results

Condar Spreadsheet (includes detailed fueling data)

Fuel stack. Kindling is on the right side.

fuel pile
Fuel pieces, numbered 1 - 9 from left to right.

Graphical data comparison of Condar tests

This page was updated on January 30, 2008
This page was created on January 30, 2008