Test HK-H10
February 28/07
Mixed size maple. 19% moisture (estimated)
6 pieces
, stacked 222. Left side ignition.
Cold heater. 3 days since last burn.
Air open.
Air setting unchanged during burn.
Animated Gif below, taken at 2 minute intervals.
Revised opacity system.
Flue gas analysis
A large number of pokes are evident from the red spikes. The two top logs were two far apart, and needed to
be reoriented several times.
Opacity.
The flashlight from HK-H09 has been replaced with a 50 watt halogen bulb.
Scaling is referenced to HK-H11, which reached 100% opacity.
Fuel Load
This page was updated on
March 4, 2007
This page was created on March 1, 2007