Return to Lopez Labs Home Page


2014 Heater Fuel Tests at Shawville

Test HK-M09
February 1, 2014

Hard maple 4x4 crib, 59.5 lbs, 19.9% moisure, 7 lbs kindling
ASTM spec for crib stacking
Stack temperature corrected for height.

Pisla HTT 602 door, 22" wide
Custom air frame, setup "C"
Rear grate reduced 50%,

2nd repeat of run HK-M07 

Condar Spreadsheet Results
Condar Spreadsheet Results

Condar Spreadsheet (includes detailed fueling data)

Animation
Animation,  5 minute intervals.

gas analysis
Flue gas
- from loading of crib onto kindling coal bed.

TESTO Excel data file

Testo graph
Testo gas graph, entire cyle


Opacity graph. For this run, the kindling was increased to 7 lbs. Ignition was very good, and PM was very low.
Opacity graph includes kindling, which is the large spike.
Opacity

fuel load
Fuel load.
Maple 4x4's were purchased by Alex Chernov in 1012, and stored inside.


Kindling is 7 lbs of split poplar at 15.5% moisture.

fuel load
Reload was at 16.6 O2 (approx 67%  O2 recovery). Faster  kindling fire,
higher PM spike, lower oxygen minimum than HK-M07 and HK-M08.


Burn sequence.


This page was updated on February 2, 2014
This page was created on February 1, 2014