Test HK-M07
January 30, 2014
Hard maple 4x4 crib, 61.1 lbs, 19.8% moisure, 7 lbs kindling
ASTM spec for crib stacking
Stack temperature corrected for height.
Pisla HTT 602 door, 22" wide
Custom air frame, setup "C"
Rear grate reduced 50%,
Very clean run because of adequate kindling.
Condar Spreadsheet Results
Condar Spreadsheet (includes detailed fueling data)
Animation, 5 minute intervals.
Video sequence taken at 34 minutes.
Steam from chimney 12 minutes after lighting kindling fire.
Steam from Chimney at 20 minutes after loading crib.
Flue gas - from loading of crib onto kindling coal bed.
Opacity graph. For this run, the kindling was increased to 7 lbs. Ignition was very good, and PM was very low.
Opacity graph includes kindling, which is the large spike.
Opacity
Fuel load.
Maple 4x4's were purchased by Alex Chernov in 1012, and stored inside.
Kindling is 7 lbs of split poplar at 15.5% moisture. Reload was at 17.2% O2 (60% recovery).
Burn sequence.
This page was updated on February 1, 2014
This page was created on January 30, 2014