Test HK-M03
January 26, 2014
Hard maple 4x4 crib, 57.0 lbs incl 3.75 lbs kindling, 20.3% moisure.
ASTM spec for crib stacking
Stack temperature corrected for height.
Pisla HTT 602 door, 22" wide
Custom air frame, setup "B"
Rear grate reduced 50%. See photo, below
Condar Spreadsheet Results
Condar Spreadsheet (includes detailed fueling data)
Animation, 5 minute intervals.
Flue gas - from loading of crib onto kindling coal bed.
Graph from Testo analyzer. 30 second sampling intervals.
Entire run, including pre and post.
Rear grate with area reduced 50%
Fuel load.
Maple 4x4's were purchased by Alex Chernov in 1012, and stored inside.
Picking up precut 4x4's fom Alex Chernov's lab in Caledon, 1 hr north of Toronto.
Kindling is 3.75 of split poplar at 15.5% moisture. (generic photo, typical load)
Burn sequence.
This page was updated on
January 29, 2014
This page was created on January 27, 2014