2006 Heater Testing at Shawville

Test HK-G11
February 18/06

Restricted air (ashbox door closed, air control open)
Large wood, large load

 

Test HK-G11
Feb 18/06

61.6 lbs

Ashbox door closed
(restricted air)

Grate was opened at 95 minutes.

Excel data file

The laser lost aim and had to be reset. Zero value in doubt.

 

 

..

 

 

 

The animation shows a frame every 30 seconds of the burn for the first twenty minutes.

After that, it shows a frame every 5 minutes, so is speeded up by a factor of 10 until the end.

The animation loads frame by frame, and then starts repeating at a frame rate of 2 fps. To see it slowly, hit the "reload" button.

 

 

 

 

   
   
 

 

   
 